Designing a commercial, administrative, hotel and mosque project
Owner: Emad Abdel Rahman Hegazy
Address: Makkah Al-Mukarramah, Al-Naseem Al-Moadel Scheme
Components Basement:
- Basement
- Basement floor- ground floor- mezzanine floor- chapel- services- 17 recurring floors
Settlement role:
- Main entrance to the mall: 24 trade fairs in addition to cultivated open spaces that contain the vertical movement elements of the project (escalators and elevators)
- The main entrance to the hotel
Ground floor:
A large main entrance in the middle of the project leads to the mosque and contains on both sides main entrances to the mall and contains a side entrance to the clinic floors
Mezzanine floor:
- Next to the commercial mall spaces
- There is a main entrance to the hotel that contains the reception and the reception hall that contains the salons
- There is a side entrance to the clinic floors
- Repeats from 1 to 13
- Two hotel towers and two clinic towers
- Each clinic tower contains 8 clinics per floor
- Each hotel tower contains 26 hotel rooms per floor
- A total of 208 clinics and 676 hotel rooms
Fourteenth floor:
- It contains 16 clinics, 36 hotel rooms and 2 hotel suites
- A large restaurant hall with its services connects the two hotel towers
- The fifteenth and sixteenth floor
- It contains 6 halls of restaurants next to the main dining hall on two floors
- The seventeenth floor contains 13 multi-purpose halls